Matunga LHB Coach Maintenance Facilities
Indian Railways / COFMOW
Civil
Mechanical
Electrical
- 27,090 m³
- RCC
- 1,816 MT
- Structural Steel
- 6,000 kVA
- Electrical System
- 3,089 m
- BG Track
- 2,749 m
- Inspection Pit & Traverser Track
- 80 t
- CNC Traverser
Overview
A major multidisciplinary development creating LHB coach maintenance facilities at Matunga Workshop, integrating civil, structural, electrical and mechanical works, including 2,749 m of inspection pit and traverser track.
The facility also incorporated a 6,000 kVA electrical system and specialised railway equipment: an 80-tonne CNC traverser, EOT cranes and CNC shot-blasting equipment.