Gallery
Our work, on site.
Photographs from our railway projects, our work beyond the railway, our own plants at Vindhane and Karjat, and safety on our sites. Select any photograph to enlarge it.
Railway Projects
Stations, sheds, bridges and track.
Panvel–Karjat Railway Line
-
Steel girder lifted in at Chowk, RCC box segments staged in front -
Crane lifting a pre-assembled track panel on the corridor -
Track-panel lift under way, excavator working alongside -
Night work: rail cutting on the corridor
Matunga Workshop
Civil works
-
Name wall and the water channel along the entrance walk -
Office block side elevation and service lane -
Renovated two-storey block with a landscaped forecourt -
Shed facade under scaffold netting, covered coach entry below -
Workshop gate with the new office block beyond -
Office block and its paved approach -
Planting bed along the office block -
Paved drive to the office block entrance -
Potted palms lining the entrance walk -
Name wall seen head-on, its fountain lit, at the workshop entrance -
Stone planters and the name wall from the side -
Boundary screens, with the workshop gate beyond -
Planted bed along the tiled boundary wall -
Office block end elevation -
Tiled boundary wall with green panels -
Tensile canopy over the office block entrance -
Lobby planters and wall-mounted artwork -
Frosted-glass entry to the manager's suite -
Corridor of timber doors and framed paintings -
Stair void and corridor on the upper floor -
Office with meeting table and timber-panelled walls -
Lounge seating, front view -
Lounge corner under a Vande Bharat painting -
Sofas against the timber panelling -
Manager's desk and visitor chairs -
Manager's office seen from the lounge -
Office meeting table and wall art -
The Chief Workshop Manager's nameplate -
Conference room from the window side -
Carriage workshop office building -
Workshop facility block and landscaped approach
Mechanical works
-
Vande Bharat trainset inside the maintenance shed -
Looking down the workshop yard from above -
Boom lift at work under the shed roof trusses
Electrical works
-
Workshop entrance monument at dusk -
Tensile canopy over the forecourt, lit at dusk -
The manager's office reception, full height -
Lit stair treads and steel handrail -
Courtyard and tensile canopies at night -
Office block cove lighting at dusk -
Workshop name board and gate at night
Nhava Sheva & Uran Railway Stations
-
Nhava Sheva station from the air, platform roof and approach roads -
Nhava Sheva platforms under the full-length truss roof -
Nhava Sheva station in its landscape -
Nhava Sheva platform and station nameboard -
Nhava Sheva during construction, materials on site -
Nhava Sheva station building nearing completion -
Uran station's arched platform roof, from the air -
Uran platform under the arched canopy -
A suburban train at Uran platform, January 2024 -
Uran platform at dusk under the arched roof -
Uran station building on opening day
Harbour Line FOBs & Trespass-Control
-
On the deck, inside the Vashi FOB truss -
Vashi FOB end to end, stair to span -
Stair tower and piers of the Vashi FOB -
Canopied stair up to the Vashi FOB deck -
Truss in place at Vashi, crane on site below -
Twin cranes at dusk during erection works at Vashi -
Stair up to the FOB deck -
Inside the steel truss, along the FOB deck -
FOB stair landing with arched railings -
Truss FOB spanning the tracks -
FOB stair rising to the deck -
Stair to the FOB, front view -
FOB spanning the tracks under the overhead wires
Mumbai Harbour Line Station Redevelopment
-
Site workforce assembled at Mankhurd, January 2026 -
Safety briefing for the Mankhurd site team -
Marking 75,000 safe man-hours without a lost-time incident
Sanpada Carshed
-
Carshed from the air: sheds, stabling lines and yard -
Rakes stabled under the shed roofs, from the air -
Carshed administration building -
Guests welcomed with bouquets at the inauguration, January 2026 -
A bouquet of welcome at the entrance porch -
Greeting guests on the red carpet -
The entrance on inauguration morning -
The arched gateway under a clear sky -
Frontage and entrance porch, towers beyond -
Greetings on the red carpet at the entrance -
Carshed sheds across the grounds, with inset views of the finished buildings -
Boom lift at work inside a shed under construction -
Shed interior, EOT crane spanning the bay
Matunga Z-Bridge
-
The covered bridge running the length of the workshop yard, ventilators along its roof -
Granite flooring and toughened-glass side screens on the deck -
Steel girders set in place during erection -
Mobile crane lifting the arched roof members onto the bridge -
Arched roof members going up along the deck -
Roof sheeting erected above the running workshop -
Laser-cut steel screens dressing a support tower at ground level
Matunga LHB Coach Maintenance Facilities
-
LHB coach shed under its full-length arched roof
Social & Public Infrastructure
Beyond the railway.
Bonkode FOB
-
The skywalk on its steel trestles over the landscaped median -
Steel stair and walkway meeting at a lift tower -
The skywalk curving over the road -
The skywalk seen down the carriageway -
Lift tower and skywalk span -
Stair access up to the skywalk -
Inside the enclosed skywalk -
Canopied stair, front view
Ulwe Hospital
-
The completed building, seen from its gate
Ulwe CIDCO School
-
The school's long elevation and boundary wall
Karanjade Health Care
-
The health centre, its blue glazed column running full height -
The health centre tower, blue glazed strip and brown cladding
Kharghar Golf Course
-
The clubhouse seen across the green -
The clubhouse, its stone base and timber-screened terrace -
The course, with the Kharghar hills behind -
Single-storey pavilion with a stone base -
Kharghar Valley Golf Course name wall and course map -
Clubhouse terrace among palms -
A fairway beneath the Kharghar hills -
A winding path across the course, city towers behind
Lush Meadows
-
The entrance porch, the name lettering above it
Rabale Skywalk
-
The skywalk over the Thane–Belapur road, a lift tower at each end -
The enclosed walkway between its two glazed towers -
A glazed lift tower at street level -
The skywalk over the Thane–Belapur road, a hoarding alongside -
Skywalk meeting a glazed lift tower -
A lift tower's street entrance, the walkway joining it at the top
Integrated Resources
Where our steel and concrete come from.
Vindhane Steel Fabrication Plant
-
Fabricated plate girders laid out in the yard, Hydra crane alongside -
Welder at a wire-feed welding set inside the fabrication shed -
The fabrication shop, a fully clad steel shed -
Installing the 20-tonne EOT crane girder inside the shed -
Fabricated girders for the railways loaded out under the EOT crane -
A painted girder lifted onto a trailer for dispatch -
Fabricated members on a trailer, ready to leave the yard -
Arched members fabricated and primed in the yard -
The metallising shop -
The painting shop, its entry hung with strip curtains -
The plant's diesel generator, keeping the shops running on their own power -
Concreting the plant's approach road -
Building the plant's storm-water drain -
The plant team and truck fleet lined up outside the shed -
EOT crane spanning a fabrication shed bay -
EOT crane across the fabrication shed, the crew at work on the floor below -
Dussehra celebration lunch at the plant
RMC Plant, Karjat
-
The batching plant under its red cladding, aggregate stockpiles in front -
Inside the covered shed: a transit mixer loading at left, a cement bulker at right -
A transit mixer loading under the batching plant -
A cement bulker unloading into the covered bay -
The cement silos lifted into place by mobile crane -
Cladding the plant enclosure, a mobile crane lifting steel -
The strip-curtained loading bay inside the shed -
Handover of new tipper trucks for the plant
Health, Safety & Environment
Safety, on every site.
Health, Safety & Environment
-
Addressing the workforce at the 75,000 safe man-hours celebration, Mankhurd -
A speech under the 75,000 safe man-hours banner -
Speaking to the site team at the celebration -
Site leadership lined up before the seated workforce -
Site leaders addressing the workforce -
Engineers and supervisors at the celebration -
Safety certificate presented to a site team member -
A certificate and a handshake under the celebration banner -
Recognising a team member for the safe man-hours milestone -
Certificate handed over in front of the seated workforce -
Safety certificate presented to a site team member -
A certificate and a handshake under the celebration banner -
Recognising a team member for the safe man-hours milestone -
Certificate handed over in front of the seated workforce -
Safety certificate presented to a site team member -
A certificate and a handshake under the celebration banner -
Recognising a team member for the safe man-hours milestone -
Certificate handed over in front of the seated workforce -
Safety certificate presented to a site team member -
A certificate and a handshake under the celebration banner -
Recognising a team member for the safe man-hours milestone -
Certificate handed over in front of the seated workforce -
Safety certificate presented to a site team member -
A certificate and a handshake under the celebration banner -
Recognising a team member for the safe man-hours milestone -
Certificate handed over in front of the seated workforce -
Safety certificate presented to a site team member -
A certificate and a handshake under the celebration banner -
Recognising a team member for the safe man-hours milestone -
Certificate handed over in front of the seated workforce -
Safety certificate presented to a site team member -
A certificate and a handshake under the celebration banner -
Recognising a team member for the safe man-hours milestone -
Certificate handed over in front of the seated workforce -
Safety certificate presented to a site team member -
A certificate and a handshake under the celebration banner -
Recognising a team member for the safe man-hours milestone -
Certificate handed over in front of the seated workforce -
Safety certificate presented to a site team member -
The whole Mankhurd workforce assembled with their certificates -
Workforce assembled for the safety milestone photograph -
Group photograph, certificates in hand -
Safety meeting in the site office -
Safety training: fire-extinguisher drills and PPE checks -
Toolbox talks, safety meetings and a fire-extinguisher drill -
Safety review meeting in the site office -
Workers and engineers around the site-office table -
Site perimeter secured with sheet barricading -
Sheet barricading around the site boundary -
National Safety Week at Karjat: 3,00,000 safe man-hours without a lost-time injury -
National Safety Day at Mankhurd Station: safety pledge and awards -
Free medical camp at Mankhurd for 50 workers and staff -
Lifting procedure and tools-and-tackles training at Govandi -
Ambient air-quality monitoring on the Mankhurd site -
The site workforce marks World Environment Day -
Prize distribution for safe work on site -
Electrical-shock mock drill at Mankhurd: the casualty is moved to a standby ambulance -
Heat-stress mock drill at Karjat: a workman in a full-body harness on the scaffold tower -
Heat-stress mock drill at Karjat: the casualty down on the deck -
Heat-stress mock drill at Karjat: the supervisor raises the alarm by phone -
Heat-stress mock drill at Karjat: the casualty is carried clear of the work area -
Heat-stress mock drill at Karjat: a responder checks the casualty on the stretcher -
Heat-stress mock drill at Karjat: the casualty is strapped to the stretcher -
Heat-stress mock drill at Karjat: the stretcher is lifted -
Heat-stress mock drill at Karjat: four men carry the stretcher out -
Heat-stress mock drill at Karjat: the stretcher team on the move -
Heat-stress mock drill at Karjat: head count and debrief with the crew -
Work-at-height mock drill at Karjat: the crew attends the casualty at the foot of the scaffold -
Work-at-height mock drill at Karjat: the casualty is lifted on the stretcher -
Work-at-height mock drill at Karjat: the casualty is carried to a vehicle -
Work-at-height mock drill at Karjat: the casualty is loaded into the vehicle -
Work-at-height mock drill at Karjat: head count after the drill -
Fire mock drill at Mohape: the HSE executive aims the extinguisher's hose at the test fire -
Fire mock drill at Mohape: a worker holds the extinguisher ready beside the burning tray -
Fire mock drill at Mohape: a supervisor readies the extinguisher at the test fire -
Fire mock drill at Mohape: the HSE executive explains the extinguisher to the crew -
Fire mock drill at Mohape: the HSE executive holds up the extinguisher for the crew to see -
Fire mock drill at Mohape: the crew gathers round the HSE executive and the extinguisher -
Fire mock drill at Mohape: the HSE executive turns the extinguisher towards the fire -
Fire mock drill at Mohape: the HSE executive shows the hold, hose in hand -
Fire mock drill at Mohape: the HSE executive crouches at the fire with the extinguisher -
Fire mock drill at Mohape: the crew leans in as the HSE executive reaches the fire -
Fire mock drill at Mohape: the powder jet hits the fire -
Fire mock drill at Mohape: a supervisor puts the fire out, and the tray smokes under the powder -
Fire mock drill at Mohape: a worker takes his turn with the extinguisher -
Fire mock drill at Mohape: the crew and supervisors after the drill -
Snake-bite mock drill at Karjat: nearby workers attend at the spot -
Snake-bite mock drill at Karjat: the casualty on the stretcher, his arm bandaged and kept still -
Snake-bite mock drill at Karjat: the stretcher is brought to a vehicle for the run to hospital -
Snake-bite mock drill at Karjat: the crew gathers for the safety officer's briefing -
Snake-bite mock drill at Karjat: the safety officer talks a worker through the response -
Snake-bite mock drill at Karjat: the safety officer demonstrates first aid on a worker's arm -
Snake-bite mock drill at Karjat: head count at the end of the drill