Matunga Z-Bridge

Central Railway

Civil Structural Steel
303 m
FOB Length
704.88 MT
Structural Steel
1,584 m³
RCC
Overview

The Matunga Z-Bridge, the Matunga Workshop FOB, is a strategically located pedestrian infrastructure project at Matunga Workshop, involving RCC construction, structural steel and girder fabrication, piling, roofing, side glazing and finishing works.

K.D. Constructions fabricated the FOB's steel and launched and erected it above a running railway line.

The bridge restored the daily link between Matunga East and West after more than a year with the original footbridge closed, a crossing relied on by lakhs of commuters, students and residents.

Project Gallery
  • Matunga Z-Bridge by K.D. Constructions. The covered bridge running the length of the workshop yard, ventilators along its roof
    The covered bridge running the length of the workshop yard, ventilators along its roof
  • Matunga Z-Bridge by K.D. Constructions. Granite flooring and toughened-glass side screens on the deck
    Granite flooring and toughened-glass side screens on the deck
  • Matunga Z-Bridge by K.D. Constructions. Steel girders set in place during erection
    Steel girders set in place during erection
  • Matunga Z-Bridge by K.D. Constructions. Mobile crane lifting the arched roof members onto the bridge
    Mobile crane lifting the arched roof members onto the bridge
  • Matunga Z-Bridge by K.D. Constructions. Arched roof members going up along the deck
    Arched roof members going up along the deck
  • Matunga Z-Bridge by K.D. Constructions. Roof sheeting erected above the running workshop
    Roof sheeting erected above the running workshop
  • Matunga Z-Bridge by K.D. Constructions. Laser-cut steel screens dressing a support tower at ground level
    Laser-cut steel screens dressing a support tower at ground level