Signature Project
Matunga Z-Bridge
Central Railway
Civil
Structural Steel
- 303 m
- FOB Length
- 704.88 MT
- Structural Steel
- 1,584 m³
- RCC
Overview
The Matunga Z-Bridge, the Matunga Workshop FOB, is a strategically located pedestrian infrastructure project at Matunga Workshop, involving RCC construction, structural steel and girder fabrication, piling, roofing, side glazing and finishing works.
K.D. Constructions fabricated the FOB's steel and launched and erected it above a running railway line.
The bridge restored the daily link between Matunga East and West after more than a year with the original footbridge closed, a crossing relied on by lakhs of commuters, students and residents.
Project Gallery
-
The covered bridge running the length of the workshop yard, ventilators along its roof -
Granite flooring and toughened-glass side screens on the deck -
Steel girders set in place during erection -
Mobile crane lifting the arched roof members onto the bridge -
Arched roof members going up along the deck -
Roof sheeting erected above the running workshop -
Laser-cut steel screens dressing a support tower at ground level