Ongoing Project
Panvel–Karjat Railway Line
Mumbai Railway Vikas Corporation Limited (MRVC)
Civil
Ongoing, 90%+ Complete
- 29.6 km
- Double-Line Corridor
- 50,341 m³
- RCC
- 4,686 MT
- Structural Steel
- 146,814 m³
- Earthwork
Overview
A 29.6 km double-line suburban railway corridor forming part of MUTP-III, connecting Panvel with Chikhale, Mohape, Chowk and Karjat. K.D. Constructions is executing station buildings, service buildings, platforms, COPs, FOBs, subways, RRI facilities, booking offices, OHE/PSI infrastructure, roads and earthwork across the corridor.
The scope includes subway construction by pushing RCC box sections beneath running railway lines with overhead OHE, a method chosen because the corridor stays live throughout. The project is now over 90% complete.
Project Gallery
-
Steel girder lifted in at Chowk, RCC box segments staged in front -
Crane lifting a pre-assembled track panel on the corridor -
Track-panel lift under way, excavator working alongside -
Night work: rail cutting on the corridor