Sanpada Carshed
Central Railway
- 11,338 m³
- RCC
- 1,412 MT
- Structural Steel
- 3
- Inspection Pit Lines
- P-Way
- Track Laying Works
A comprehensive railway maintenance infrastructure development at Sanpada Carshed, comprising an Inspection Shed with three pit lines, Heavy Repair Shed, Administration Building, Canteen, Time Office, Security Building, Battery Room and associated infrastructure.
The project involved substantial civil and structural execution alongside P-Way track laying works, creating integrated facilities to support efficient railway maintenance and operations.
The work ran across three Central Railway contracts. Two were under MUTP-II: the extension of the Heavy Repair Shed, Light Repair Shed and Inspection Shed over lines 4 to 8, with a first floor for the Administration Building, laboratories, further buildings and the associated track modification; and a second Heavy Repair Shed for EMU rakes. The third delivered Inspection Sheds with three and two pit lines and a Feeder Shed.
K.D. Constructions also carried out signalling and telecommunication works at Sanpada Carshed.
-
Carshed from the air: sheds, stabling lines and yard -
Rakes stabled under the shed roofs, from the air -
Carshed administration building -
Guests welcomed with bouquets at the inauguration, January 2026 -
A bouquet of welcome at the entrance porch -
Greeting guests on the red carpet -
The entrance on inauguration morning -
The arched gateway under a clear sky -
Frontage and entrance porch, towers beyond -
Greetings on the red carpet at the entrance -
Carshed sheds across the grounds, with inset views of the finished buildings -
Boom lift at work inside a shed under construction -
Shed interior, EOT crane spanning the bay